Search results for "Stressing sequence"

showing 2 items of 2 documents

Stressing Sequence for Hanger Replacement of Tied-Arch Bridges with Rigid Bars

2022

The construction of bridges with suspenders, such as cable-stayed or tied-arch bridges, needs deep study of the prestressing forces to be applied to stays or hangers in all stages, depending on the construction technique adopted. In these cases, the main issue is the determination of the initial forces and optimization of the prestressing system in terms of stressing values and sequence. When the bridge is already built and suspenders have to be replaced for maintenance, a different problem has to be faced by the engineer, because the sequence of replacements and the values of the axial stresses depend very much on the service conditions of the bridge and on its historical evolution from co…

Tiebusiness.industryPrestressBuilding and ConstructionStructural engineeringArchBowstring bridgeBridge engineeringCorrosionSettore ICAR/09 - Tecnica Delle CostruzioniStressing sequenceSteel bridgeArchHangersbusinessGeologyCivil and Structural EngineeringSequence (medicine)Journal of Bridge Engineering
researchProduct

Construction stages of cable-stayed bridges with composite deck

2012

A cable-stayed bridge is built by following a construction sequence of different subsequent stages that imply changes of the geometric configuration, restraints and consequently stress and strain patterns. A study is presented about stay stressing sequences in cable-stayed bridges with composite deck for the case of construction made by the cantilever method. Initial cable forces are found through partial elastic schemes of construction stages. Different stay stressing procedures are implemented and a comparison between them is proposed in order to evaluate the differences in terms of deformed shape and internal force distribution of the deck and the pylon. Results can be useful to give pra…

constructionEngineeringCable-stayed bridge; composite section; pretension; stays; stressing sequencebusiness.industryGeometric configurationStress–strain curveComposite numberBuilding and ConstructionStructural engineeringBridge (nautical)DeckSettore ICAR/09 - Tecnica Delle CostruzioniCantilever methodPylonsteelCable stayedBridgebusinessBridge Structures
researchProduct